——“Samhoor nicety machine”it began in 2000 year,focus on Precision punching, high-speed presses production stamping equipment R & D .
Dedicated, professional, quality !
To introduce you to the three high-speed presses maintenance
A maintenance
Stamping completed should do the following:
1. Arrange cleaning, sweeping punch equipment;
2. High-speed rail to the press crankshaft, connecting rod axis ball screw refueling refueling;
3. Check high-speed presses manipulator, clutches and brakes are normal;
4. Check the oil presses, oil pump is intact;
5. When the holiday period is not applicable or punch to punch table, rails, mold and other good rust protection, avoid long-term does not apply cause surface rust.
Two maintenance
1. 10-12 weeks to check regularly punch shaft, copper sleeve, bearing operation, disassembly or replacement of fuel;
2. Periodic inspection punch clutch actuator, disassemble refueling, observe the wear of its components, timely repair or replacement.
Three maintenance
According to the actual situation of press equipment operation, a year and a half to two years to deal with a high-speed presses Miho equipment disassembly key parts inspection, in order to bring the punch and precision equipment recovery performance.