——“Samhoor nicety machine”it began in 2000 year,focus on Precision punching, high-speed presses production stamping equipment R & D .
Dedicated, professional, quality !
On the need to pay attention to the maintenance of 22 high-speed presses
1, must be carefully checked before repairs begin all the tools properly, and strict safety regulations installation operations use.
2, repair people together must contact co-ordination, non-random act and do not communicate.
3, in the vertical rail removable aisle box, headstock and other components, or in his next work, make sure the parts on the vertical rail lifted with a crane and use wood pads firmly to avoid wounding the whereabouts of these components.
4, removable high-speed presses, the first should be familiar with the performance of high-speed presses, the main function of the role of each part, in strict accordance with step disassembly.
5, compression equipment repair should be carried out in accordance with the provisions of the pressurized container. When using a blowtorch, blowtorch strict compliance with safety rules.
6, then handed the tool material, the part is prohibited throwing.
7, the removed parts must be placed neatly, not free throw put, can scroll parts to be stuck on both sides, to prevent its rotation.
8, triangular pylons, be sure to three feet with a rope tied to prevent slipping.
9, high-speed presses before repairs, make sure the power supply and the associated part (such as an operating lever, switch on the bus, piping, etc.) are cut and punch Insurance pull off the master switch, hang "Someone overhaul prohibited use" warning signs, to avoid mistakenly opened high-speed presses accidents.
10, be sure to use an electric drill with a three-core or four-core phasing socket and ensure good grounding.
11, when removing the high-speed presses, hands and feet can not be placed or riding in the rotating part of the high-speed punch.
12, be sure to use running lights with 36V or 36V voltage following safety.
13, using a hand drill Wear insulating protective gear. You must wear protective glasses when drilling.
14, high-speed presses should be carefully disassembled resilient parts, to avoid wounding the parts sudden pop, high-speed stamping bed demolition hammer should first lay down.
15, be sure to use parts when dismantling heavy lifting facilities, not to forcibly move manpower.
16, be sure to test electricity through professional electrician before commissioning after the wires properly connected.
17, must be in accordance with safety procedures when using an electric crane or crane hand.
18, high-speed punch guide and non-paint surface put tools, measuring tools, cutting tools, auxiliary equipment and artifacts.
19, when the shaft is inserted combination of high-speed presses, prohibited by hand guiding hand to detect or handle into the hole.
20, when hammering parts, by striking surface should pad hardwood, copper rods or nylon 66 rods and other materials.
21, the loading and unloading of parts, components and porters when members, to safe and reliable, to avoid damage to parts falling or injury.
22, after the completion of repair work to do to clean up clean, mostly clear space, clean equipment, tools clean.